Excavation/Shoring

Project Info

  • Category

    Excavation & ERS

Excavation on a typical Chicago lot with sheetpiling and cross-site bracing. Site was excavated 7 feet below sidewalk elevation and sheetpiling was stopped at 12 feet below.